Project Photo Gallery PDF Print E-mail

Early 2012 Construction

img 2819 275 img 2820 275

 

Tunnel Breakthrough, November 29, 2011

breakthrough1_245 4th-bore015_245

Photos courtesy of Karl Nielsen.

 

Fall 2011 Construction

fall 2011 construction fall 2011 construction

 

July 2011 Construction

West Portal Crosspassages

Excavation of the first of seven cross passages between bores four and three has started. The cross passages will serve as a safety feature for motorists when the new tunnel opens to traffic

west_july1_th west_july2_th west_july3_th west_july4_th
west_july5_th west_july6_th west_july7_th west_july8_th

June 2011 Construction

East Portal

east-061811_th east-061811_miner_th

Photos courtesy of Karl Nielsen, Metropolitan Transportation Commission (MTC)

March 2011 Construction

West Portal, March 13, 2011
Equipment is Mobilized for Tunneling on the Western Side

west bore Mar 13, 2011 west bore Mar 13, 2011 west bore Mar 13, 2011 west bore Mar 13, 2011
IMG_0740_th IMG_0743_th spacer spacer

West Portal, March 11, 2011
Equipment is readied for application of shotcrete, a kind of concrete applied at high pressure to provide reinforcement

west_03-11_20_th west_03-11_1_th west_03-11_2_th west_03-11_3_th west_03-11_5_th
west_03-11_6_th west_03-11_7_th west_03-11_8_th west_03-11_9_th west_03-11_10_th
west_03-11_11_th west_03-11_12_th west_03-11_13_th west_03-11_14_th west_03-11_15_th
west_03-11_17_th west_03-11_18_th west_03-11_19_th west_03-11_20_th spacer

January 2011 Construction

East Portal

east01-2011_1_th east01-2011_2_th east01-2011_3_th east01-2011_4_th east01-2011_5_th
east01-2011_6_th east01-2011_7_th east01-2011_8_th east01-2011_9_th east01-2011_10_th
east01-2011_11_th east01-2011_12_th east01-2011_13_th east01-2011_14_th east01-2011_15_th

West Portal

west01-2011_1_th west01-2011_2_th spacer spacer spacer

November 2010 Construction

West Portal

westportal1_th westportal2_th westportal3_th westportal4_th westportal5_th
westportal6_th westportal7_th westportal8_th westportal9_th westportal10_th
westportal11_th westportal12_th westportal13_th westportaldrillbit_th westportaldrill_th

East Portal

eastportal1_th eastportal2_th eastportal3_th eastportal4_th safetygear_th
safetyrequirements_th safetysigns_th authorizedonly_th brassinout_sign_th brassboard_th

October 2010 Construction

acelerator_th concrete-cores_th constricted-work-site_th gettin-deep_th grinding_th
mixing-concrete_th roadhead-006_th roadhead-015_th roadheader-pic_th shocrete_th
shotcrete-again_th shotcrete-grind_th mix-a-batch_th shotcrete-test_th spraying-shotcrete_th
testing-the-dirt_th tooth-repair_th tunnel-muck_th two-lifts-into-tunnel_th west-portal_th

Tunneling Commencement Event

9341d_020_th 9341d_021_th 9341d_049_th 9341d_050_th 9341d_057_th
9341d_062_th 9341d_067_th 9341d_070_th 9341d_075_th 9341d_081_th
9341d_084_th 9341d_088_th 9341d_090_th 9341d_100_th 9341d_109_th
9341d_111_th 9341d_112_th 9341d_114_th 9341d_117_th 9341d_118_th
9341d_122_th 9341d_125_th 9341d_130_th 9341d_144_th 9341d_153_th
9341d_157_th 9341d_162_th 9341d_166_th

Groundbreaking Event

9139d_188_th 9139d_213_th 9139d_065_th 9139d_048_th 9139d_001_th
9139d_073_th 9139d_082_th 9139d_095_th 9139d_097_th 9139d_107_th
9139d_110_th 9139d_124_th 9139d_133_th 9139d_135_th 9139d_141_th
9139d_147_th 9139d_148_th 9139d_151_th 9139d_155_th 9139d_196_th
9139d_020_th 9139d_205_th 9139d_199_th 9139d_208_th 9139d_223_th
9139d_227_th 9139d_041_th

Historic Photos of the Caldecott Tunnel

2_11_th 42_042_th 78a_025_th 26_32_th 28_14_th
40_31_th 57_002_th 57_007_th 59_013_th 60_016_th
60_018_th 63_004_th 76_031_th 79a_004_th 79a_036_th